Power flow

  1. 1Condition detected
  2. 2Likely cause
  3. 3Recommendation
  4. 4Sample approval
  5. 5Action
  6. 6Verified outcome

Use the highlighted step, or auto-play.

Site energy path

Reference state

Reference state. Unit A 282.4 kW; Unit B 282.4 kW; Unit C 235.3 kW. Load 800 of 800 kW.

Shared busUnit A282.4 / 600 kWUnit B282.4 / 600 kWUnit C235.3 / 500 kWData-center load800 / 800 kW Eligible capacity 1,700 kW · protected reserve 220 kWLoad stays outside the protected reserve

Before

550 kW

Proposed

800 kW

Verified

Pending

Redundant-source failover

Condition detected

Why: An alarm arrived from Unit A; the reference allocation is shown before diagnosis.

Try a failure condition
Session audit · 0 events
    What a real site needs

    Manufacturer-documented device profiles, authorized adapters, site permissions, commissioning and a cyber/compliance review. Source technology here is deliberately unspecified; flowing dots show allocation, not measured waveforms.

    Presenter notes

    Start with the alarm. Pause at approval. Show that an acknowledgment is not recovery: only a fresh reading closes the incident. Technician dispatch is the exception, not the first step.

    Synthetic sample equipment and readings. No device is connected and no command leaves this browser.