Power flow
- 1Condition detected
- 2Likely cause
- 3Recommendation
- 4Sample approval
- 5Action
- 6Verified outcome
Use the highlighted step, or auto-play.
Site energy path
Reference stateReference state. Unit A 282.4 kW; Unit B 282.4 kW; Unit C 235.3 kW. Load 800 of 800 kW.
Before
550 kW
Proposed
800 kW
Verified
Pending
Redundant-source failover
Condition detected
Why: An alarm arrived from Unit A; the reference allocation is shown before diagnosis.
Try a failure condition
Session audit · 0 events
What a real site needs
Manufacturer-documented device profiles, authorized adapters, site permissions, commissioning and a cyber/compliance review. Source technology here is deliberately unspecified; flowing dots show allocation, not measured waveforms.
Presenter notes
Start with the alarm. Pause at approval. Show that an acknowledgment is not recovery: only a fresh reading closes the incident. Technician dispatch is the exception, not the first step.
Synthetic sample equipment and readings. No device is connected and no command leaves this browser.