Energy Exchange
Model surplus power and flexibility you might offer. Every number is a scenario; live ordering, dispatch and billing are turned off.
Evidence status
- Working: hourly export limits, net value after losses, fuel, O&M and fees, fee and community split, private saving with revision history, downloadable summary.
- Tested: export and value rules are covered by automated checks.
- ERCOT only — pathway: export counts only for conventional registration or an ADER pilot with 2+ metered premises. Behind-the-meter sites stay model only.
- Not connected: meter data, settlement data, utility, market operator or partner (QSE, scheduling coordinator, VLP, aggregator). "Verified" data cannot be selected until a real feed exists.
- Investor demos: share the downloaded summary by hand. It is not linked to any investor area and nothing is sent automatically.
0. ERCOT participation pathway
Per ERCOT guidance (Nov 2, 2026): the ADER pilot needs at least two distinct metered premises with QSE telemetry. A single data center or generating site is generally evaluated under conventional registration.
Pathway: Not selected yet. Export is not counted until a pathway is chosen.
Market & pilot readiness
Card 2026.11-r1 · reviewed 2026-11-21 · Planning only · not registered
- Dispatch
- 5-minute security-constrained economic dispatch
- Settlement interval
- 15-minute settlement intervals
- Day-ahead
- Hourly Day-Ahead Market
- Currency
- USD
Route
Start with a qualified QSE / aggregator partner that already represents resources.
- Qualified QSE / aggregator partnerRecommended first pilot routeRecommended
- Resource Entity (asset owner/controller)Only if the customer or partner owns/controls the resource and must register itConditional
- Site / resource registrationDepends on resource type, size and who controls itConditional
- GRIDSTROM qualifies as its own QSELater option; capital, credit, 24/7 desk and qualification testingLater · higher burden
Conventional registration covers one resource. ADER aggregates several premises; it is a pilot with limits, not open to every site, and no capacity is reserved.
Readiness
- QSE acknowledgement · Not startedRecord the QSE partner; acknowledgement is not verified here.
- Interconnection / export permission · Not startedCustomer-supplied reference only.
- Settlement-quality metering · Not startedMeter evidence is unverified.
- QSE data link & telemetry · Not startedNo telemetry connection exists here.
- Commissioning · Not startedRecord commissioning evidence when available.
- Registration path check · Requires local market reviewConventional single resource; RE registration only if the owner/controller must register.
Sources: ERCOT Registration & Qualification · ERCOT QSE registration & roles · PUCT
Automation (simulation only)
Suggests bids from your own hourly figures and limits. Nothing is sent to ERCOT, a QSE or any device, and no money is settled. Live use needs legal registration, a signed QSE agreement and a tested connection first.
Optional: Flexible load / compute response
Model how much facility load (for example AI compute) could be reduced for a period. Works for any pathway, including behind-the-meter model-only sites. Avoided load is shown separately and never added to export. Market or program eligibility is decided by your QSE and utility. Nothing is dispatched.
1. Scenario and data source
2. Hourly profile (representative day)
Firm load, available generation and an optional price for each hour. Leave price blank if unknown — no value is assumed.
| Hour | Load MW | Generation MW | Price $/MWh | Surplus MW | Permitted export MW |
|---|---|---|---|---|---|
| 00:00 | 0.00 | 0.00 | |||
| 01:00 | 0.00 | 0.00 | |||
| 02:00 | 0.00 | 0.00 | |||
| 03:00 | 0.00 | 0.00 | |||
| 04:00 | 0.00 | 0.00 | |||
| 05:00 | 0.00 | 0.00 | |||
| 06:00 | 0.00 | 0.00 | |||
| 07:00 | 0.00 | 0.00 | |||
| 08:00 | 0.00 | 0.00 | |||
| 09:00 | 0.00 | 0.00 | |||
| 10:00 | 0.00 | 0.00 | |||
| 11:00 | 0.00 | 0.00 | |||
| 12:00 | 0.00 | 0.00 | |||
| 13:00 | 0.00 | 0.00 | |||
| 14:00 | 0.00 | 0.00 | |||
| 15:00 | 0.00 | 0.00 | |||
| 16:00 | 0.00 | 0.00 | |||
| 17:00 | 0.00 | 0.00 | |||
| 18:00 | 0.00 | 0.00 | |||
| 19:00 | 0.00 | 0.00 | |||
| 20:00 | 0.00 | 0.00 | |||
| 21:00 | 0.00 | 0.00 | |||
| 22:00 | 0.00 | 0.00 | |||
| 23:00 | 0.00 | 0.00 |
3. Limits, costs and allocation
4. Permissions and partners
Recorded for planning only. Export counts as 0 MW until permission and a reference are entered.
Scenario results (annualized, hypothetical)
Not revenue, savings, settlement or tax figures. "Missing input" means a value was not entered.
- Permitted export
- 0.0 MWh/yr
- Delivered after losses
- 0.0 MWh/yr
- Firm exportable (lowest hour)
- 0.00 MW
- Scenario energy value
- $0
- Scenario capacity value
- $0
- Fuel + O&M
- $0
- Partner fees
- $0
- Scenario net export value
- $0
- Hypothetical GRIDSTROM fee
- $0
- Community benefit allocation
- $0
- Scenario customer remainder
- $0
- Avoided cost of self-served load (separate)
- Missing input
Open gates
- All values are hypothetical scenario results, not revenue, savings, tax or settlement figures.
- Live electricity ordering, dispatch and billing are disabled.
- Choose a participation pathway.
- No proof of export permission recorded.
- QSE telemetry not confirmed.
- No meter evidence recorded.
- Meter evidence is customer-supplied and not verified; no meter feed is connected.
- Export counted as 0 MW until interconnection permission and a reference are recorded.
- Enter the equipment export limit.
- No QSE or retailer selected; market participation is not possible yet.
- Settlement data source not recorded.
- No contract in progress.