Data Center Power Portfolio
Compare mixed technologies, fuels and vendors against facility load and resilience requirements.
Your saved records
No saved records in this account.
Facility load
0.00 MW
N+1 screened firm supply
0.00 MW
Storage / UPS energy (MWh)
0.00
Supply mix
Review gates
- Utility interconnection and grid availability not independently verified.
- Engineering, protection coordination, fuel supply, emissions, permits, water, noise, site footprint and vendor delivery require review.
- Enter a positive IT load.
Facility load = IT load × PUE. N+1 screening subtracts the largest supply option; split independent units into separate options. User-supplied firm percentages are assumptions, not validated capacity. Screening does not model transient response, dispatch, correlated outages or topology.
Operating-role scenario
Bridge before grid connection → backup after connection → market-flex with recorded rights. Planning only; no live controls, verified integrations or reliability guarantee.
Islanded N+1 screened supply: 0.00 MW. Grid, storage and UPS are excluded from continuous islanded capacity; independent supply units must be separate rows. This is not an islanding design.
Transition evidence
Evidence supplied means a customer-recorded reference, not independent verification or permission granted by GRIDSTROM. Fuel pressure, supply continuity, emissions, protection, cyber and applicable NERC/CIP review remain qualified-review items.
Bridge vs backup annual operating cost
Alternative scenarios: fixed annual cost + critical MW × operating hours × fuel/variable O&M cost. No market income or outage savings; do not add the two alternatives.
No saved financial scenario for this project. Costs remain unknown; sample-only pilots cannot save private records.
Bridge annual cost: Unknown
Backup annual cost: Unknown
Bridge · Review needed
- Enter a positive critical load.
- Commissioning / protection evidence missing or planned.
- Islanding permission missing or planned.
- Target transition date not recorded.
Backup · Review needed
- Enter a positive critical load.
- Commissioning / protection evidence missing or planned.
- Islanding permission missing or planned.
- Target transition date not recorded.
- Utility interconnection evidence missing or planned.
Market-flex · Review needed
- Enter a positive critical load.
- Commissioning / protection evidence missing or planned.
- Islanding permission missing or planned.
- Target transition date not recorded.
- Utility interconnection evidence missing or planned.
- Export rights missing or planned.
- Dispatch limits / market review missing or planned.
- Record dispatch limitations.