GRIDSTROM / Operations
Sample equipment · 9 devicesEnergy Orchestration
Monitor. Coordinate. Recover. Verify.
Open animated power flowLoad failover
- 1Analyze
- 2Review
- 3Approve
- 4Verify
Critical load
800 kW
Reserve floor
220 kW
Telemetry
Sample
Site energy path
Reference stateReference state. Unit A 282.4 kW; Unit B 282.4 kW; Unit C 235.3 kW. Load 800 of 800 kW.
Before / proposed · supported load (kW)
Operations console
Ready to start
Fleet loaded. Analyze current state and alarms.
Session audit / 0
- No actions yet.
About demo data
This is a local sample fleet, not a live customer deployment. Visitor approval applies only to this simulation. No credentials, commands, service messages or customer records are transmitted.
Sample profiles are independently created, not manufacturer specifications. Tracker SAMPLE-TRK-01 has a −55° to +55° movement envelope and 1° readback tolerance. Inverter SAMPLE-INV-01 declares reset/restart. Device caps and reserve remain enforced; the spare requires replacement AND commissioning approval in a real setup.
Site setup must map manufacturer-documented identity, protocols, commands, movement limits, power caps, modes, interlocks, timestamps and readback to validated adapters. Future connections use authorized OPC UA, documented APIs or signed webhooks, not scraping. Unsupported operations fail closed.
Live operations separately require site/operator authorization, commissioning, islanding permissions, emergency-stop checks and qualified cyber/NERC-CIP applicability review. Acknowledgment alone never proves recovery. Verification checks post-command readings within 30 seconds, power within 1 kW of setpoints, device caps, reserve and failed-unit isolation.